en
+380 50 459 1177 Get a consultation

Anchor columns

Anchor columns were manufactured at the request of the Metivest division of Yuzhkoks PJSC.

On the order of ONUR TAAHHUT, structural parts were manufactured – slipways for sliding the lower branch span structure for use in the construction of Zaporizhzhya bridges

Aspiration filters for installation at Metinvest’s facilities

TR-ENGINEERING has experience in the construction of solar power plants.